Opened 1966, doubling the number of stations on the network overnight

Line 2 (Bloor-Danforth Subway)

When Line 2 opened in 1966, the TTC discontinued the Bloor and Danforth streetcar routes on the very same day — the largest single cutback to Toronto's streetcar network since the original Yonge subway opened.

A TTC streetcar signed "SUBWAY DANFORTH" shortly after Line 2 opened, July 1966
TTC streetcar, July 1966 — Wikimedia Commons, Creative Commons licensed

Advertisement

Formal planning for a Bloor-Danforth subway accelerated in the late 1950s, following the success of the original Yonge subway, opened in 1954. The line was designed to replace the heavily congested Bloor and Danforth streetcar routes. Construction began in 1962, using mostly cut-and-cover methods, which caused major surface disruption along the corridor for years.

Opening day

The TTC officially opened Line 2 on February 26, 1966, with an initial segment running from Keele Station to Woodbine Station — 12.9 km and 22 stations. This doubled the number of stations on the Toronto subway network at the time, and produced the largest single cutback to the streetcar network since the Yonge line opened in 1954, since the Bloor and Danforth streetcar routes were discontinued the same day.

Extensions

Westward and eastward extensions were already under construction when the line opened, bringing the subway to Islington Avenue in Etobicoke and Warden Avenue in Scarborough by 1968. Today the line runs from Kipling to Kennedy, one of the two backbone lines of the modern TTC network.